Field Maintenance Required

Welcome to Sky Soaring Forums Restricted content Field Maintenance Required

Viewing 6 reply threads
  • Author
    Posts
    • #9168
      Don GrilloDon Grillo
      Keymaster

        We have several glider tie down areas that need some work. The Krosno, 1-26 and maybe others need some dirt added to the wooden ramps that the main wheel sits on.  It is getting increasingly difficult to move the gliders onto the ramps because of low spots in front of the ramp.

        Several of the tie down stakes have pulled out of the ground several inches and are no longer flush with the ground. This creates a hazard of damaging either the wings or fuselage should they come in contact with the stakes.  They will need to be screwed back into the ground.

        I would like to get a work crew out this week to accomplish these tasks. Please speak up if you are able to come out and help. Wednesday is looking good, weather wise.

        Don

      • #9169
        Don GrilloDon Grillo
        Keymaster

          Another field maintenance item is that the runway threshold markers need to be sprayed with Roundup.  We have the Roundup but need a sprayer as ours is not working.  If someone that owns a sprayer could bring it in and spray the markers that would be greatly appreciated.

          Don

        • #9170
          John DeRosaJohn DeRosa
          Participant

            I can be there on Wednesday with shovel in hand. We have a flat tamper in the hangar.   I assume later than buying top soil we will find dirt “lying around”.I will also bring out a sprayer but two sprayers will be better if someone has another.
            Time??  9AM??

            John H DeRosa(OHM Ω)
            West Dundee, Illinois, USA
            mailto:john@derosaweb.com
            http://derosaweb.net
            “Anyone who has never made a mistake has never tried anything new.”- Albert Einstein
            http://derosaweb.net/matrix_codes/DeRosaweb_URL_MC.png

          • #9171
            Jim HopkinsJim Hopkins
            Participant

              Jim Hopkins :  I have a sprayer and will be out Wednesday morning early.

            • #9173
              Don GrilloDon Grillo
              Keymaster

                Bob Rivas ( new associate member), I am available and interested in helping out with the field maintenance.  Is Wednesday a.m. good?

                thanks

              • #9176
                Don GrilloDon Grillo
                Keymaster

                  We have some volunteers for Wednesday morning around 9am to work on the field.  It shouldn’t take very long and maybe if we have time and the wind is right, we can burn the burnpile.
                  Don

                • #9177
                  John LincolnJohn Lincoln
                  Participant

                    I won’t be able to be at the field on Wednesday, but there is a large pile of dirt next to where the new hangar is being built that you may take some of for your filling requirements. John Lincoln

                Viewing 6 reply threads