The Harmony Road intersection is now opened in all directions and is a four way stop. The entrance from the east had been closed for 6+ months (which is how I was getting to/from SSI). Ultimately, this intersection will be a roundabout (rotary, traffic circle).
I don’t have any updates on the culvert work at our entrance as to when it will be finished. It was to have been completed last fall but there were delays which, as I understand it, IDOT fined the company for. I did notice that some over-winter work has been completed and that the one lane road has moved to the east side of Rt 20 (not that this helps us much). For trailers being driven to the field this spring I suggest entering our temporary entrance from the south rather than the north. If approaching from the north (me!) I suggest going past our entrance and turning around in the Loves parking lot or via the Elgiloy factory entrance (Tang Blvd). Hopefully, all work will be completed in 2020.
As far as I could tell the creek level was not an issue. Certainly it was within its banks as I drove down along the tie downs.
John H DeRosa(OHM Ω)West Dundee, Illinois, USA
mailto:john@derosaweb.com http://derosaweb.net “Anyone who has never made a mistake has never tried anything new.” – Albert Einsteinhttp://derosaweb.net/matrix_codes/DeRosaweb_URL_MC.png
Author
Posts
Viewing 2 reply threads
The forum ‘Restricted content’ is closed to new topics and replies.